Enclosures for charging infrastructure
& e-mobility

DC charging parks, bus depots and fleet sites need more than charging points: grid connection, metering, load management and distribution stand outdoors — in enclosures that withstand sun, frost and vandalism for decades. For this, ZPAS manufactures double-walled SZD outdoor enclosures in any special size, direct from the factory.

Request a quote Configure an outdoor enclosure

The technology behind the charging point

Every charging park has a second, invisible half: the grid connection with metering and instrument transformers, the power distribution to the charging points, the load management including communications technology — and increasingly the connection of a battery storage system that buffers peak loads. All of this stands on open ground: full sun in summer, frost in winter, road salt, impacts, vandalism.

For this, ZPAS manufactures outdoor enclosures of the SZD series in double-walled aluminium — passively insulated against solar radiation, actively climate-controlled where necessary, bayable for growing parks and in any special size up to 3,000 mm in height. The grid side is described in detail on the Energy & smart grid page.

Typical projects in charging infrastructure

⚡

DC rapid charging parks

Grid connection, metering and distribution cabinets next to the HPC chargers — bayable, weatherproof and in any special size.

🚌

Bus depots & fleets

Charge controller, distribution and control technology for depot charging — including cable trays between the charging points.

🔋

Buffered charging parks

Enclosures for storage connection, DC/DC converters and fuse protection — matched to the BESS enclosures.

🅿️

Car parks & neighbourhoods

Compact wall-mounted and floor-standing distribution boards for AC charging points — also in stainless steel for underground car parks with a road-salt atmosphere.

📶

Backend & communications

Routers, gateways and billing technology in a climate-controlled 19″ fit-out — monitored via AKCP monitoring.

🛣️

Motorways & service areas

Vandal-resistant versions (IK10) with operator locking systems for 24/7 operation in public spaces.

Requirements for charging park enclosures — clearly classified

Heat load from power electronics

Load management and distribution generate heat — ventilation, heat exchangers, a CVO cooling unit or AHP heat pump remove it, and a heater prevents condensation.

Double wall against the sun

Open ground without shade: the rear-ventilated double wall passively dampens heating-up before cooling equipment has to kick in.

Protection in public spaces

IP 54/55 according to EN 60529, IK10 according to EN 62262, 3-point locking — plus RAL colour to match the operator’s corporate design.

Scaling & rollout

Bayable cabinets and repeatable configurations: from pilot site to rollout with the same drawings — repeat orders in approx. 6 weeks.

ZPAS outdoor enclosure for charging infrastructure at a bus depot with an electric bus

Standards for charging park enclosures

The technology behind the charging point is governed by the rules for low-voltage switchgear and controlgear assemblies: distribution boards are built to IEC 61439, the enclosures are tested to IEC 62208 and CE-marked. Outdoors, the degrees of protection according to EN 60529 (IP 54/55) and impact resistance IK10 according to EN 62262 are added — 20 joules that make the difference between everyday car park life and a cabinet that has been prised open.

The operating range of the double-walled SZD aluminium enclosures extends from −40 to +70 °C: the rear ventilation between the walls takes the edge off the summer sun, a thermostat-controlled enclosure heater counters condensation and frost, and filter fans or a cooling unit deal with the waste heat from load management and power electronics.

Which enclosure for which task in the charging park?

SolutionDegree of protectionSpecial featureTypical application
SZD outdoor enclosureIP 54/55, IK10double-walled aluminium, −40…+70 °CGrid connection, metering, load management
Electrical enclosures SZE2/SZE3IP 54/55any special size, wired ex worksDistribution in plant rooms & substations
Stainless steel enclosuresIP 65 (SWN Inox)AISI 304/316, corrosion-resistantCar washes, exposed sites
Outdoor enclosure for battery storageIP 54/55Ventilation, temperature managementBuffer storage at the charging park

Custom housings to customer specification: DC chargers, AC charging posts & wallboxes

Besides the technology behind the charging point, ZPAS also manufactures the housing of the charging point itself — as a custom design to customer drawings for manufacturers of DC chargers, AC charging posts and wallboxes. Sheet metal processing, welding, powder coating and assembly come from a single source — in corporate colours and the design of your choice, from prototype to series production.

Typical features of such housings: prepared cut-outs for display, charging sockets and cable management, separate compartments for power and billing technology, ventilation or climate control for each power class — and an outer skin that matches the manufacturer’s brand. An enquiry with a drawing or sketch is enough; the quotation arrives within 2 working days at most.

Custom housings for DC chargers manufactured by ZPAS — double column with canopy, display and two charging points
DC charger in a ZPAS custom housing — canopy, display and connector cut-outs to customer drawing
AC charging posts manufactured by ZPAS with canopy and two Type 2 charging points
AC charging posts from the same production — powder-coated in the customer’s colour

Typical project: DC rapid chargers at a truck stop

Starting point: a truck stop is adding several DC rapid charging points. The chargers themselves come from the charger manufacturer — but grid connection, metering and load management need a home outdoors, right next to the access road: weatherproof, vandal-resistant, temperature-controlled all year round and with reserve for expansion.

The solution: double-walled SZD outdoor enclosures in a special size — one section for the LV main distribution board and metering, one section for load management, cable entry from below with reserve. IK10 version with three-point locking, a thermostat-controlled heater against condensation in winter, filter fans against the summer load. Delivery is wired ex works, the foundation is agreed in advance as a drawing — on site, all that remains is positioning, connecting and commissioning.

Depot & fleet: charging away from public charging points

Bus depots, haulage yards and company car parks charge more predictably than public spaces — but in rows: many charging points, one shared grid connection, central load management. The distribution and control technology then moves into a few larger cabinet sections: bayable SZD cabinets on the yard or SZE rows in the plant room, both wired ex works.

As the fleet grows, the installation grows with it: reserve spaces in the cabinet, bayability and a cable route with room to spare cost little with the initial order — and avoid conversion work during expansion. A buffer storage system relieves the grid connection when the connected load becomes a bottleneck. For operational management, metering and communications technology go into a separate, separately lockable section — so access for the grid operator, billing and maintenance stays cleanly separated, without anyone having to get past the power section.

Electric truck charging at a DC charger in a ZPAS custom housing in a depot yard

Planning checklist: enclosures for charging infrastructure

These points should be clarified before ordering:

Why ZPAS for charging infrastructure

Because rollouts need speed and repeatability: project-specific initial design with drawing approval, then identical cabinets for every further site — direct from our own production, with prepared cut-outs, mounting plates and climate control. The outdoor enclosure configurator delivers the first configuration in minutes; the cooling capacity calculator takes care of sizing the cooling.

Frequently asked questions — enclosures for charging infrastructure

Which enclosures does a DC charging park need?

Grid connection/metering, power distribution, load management/backend — plus storage connection for buffered parks. All as an SZD outdoor enclosure in a special size.

Why double-walled for charging infrastructure?

Full sun on open ground: the rear-ventilated double wall keeps radiant heat out passively — active cooling can be smaller or dispensed with altogether.

How is the waste heat managed?

In stages, from filter fan to AHP heat pump; the cooling capacity calculator provides the sizing according to IEC 60890.

Are the cabinets vandal-resistant?

IK10 (20 joules), 3-point locking, operator locking systems — optional AKCP access control with logging.

Which standards are charging park distribution boards built to?

To IEC 61439 (low-voltage switchgear and controlgear assemblies) with enclosures according to IEC 62208, CE-marked; degrees of protection according to EN 60529 (IP 54/55), impact resistance IK10 according to EN 62262.

What happens in the charging park cabinet at sub-zero temperatures?

A thermostat-controlled enclosure heater (HGE, 50–400 W) keeps the equipment above the dew point and prevents condensation and frost — sized and wired ex works.

How long does a custom charging park cabinet take?

8–10 weeks from approval for a new drawing, approx. 6 weeks for repeat orders. The quotation with drawing arrives within 2 working days at most.

All questions in the FAQ →

Planning a charging park or depot?

A site list and specification are enough — we will reply with a concept and quotation within 2 working days at most.